apply_segment_constraints could add far more grid energy than requested when
max_cycles_per_day or min_charge_duration_minutes forced bridging across
expensive gaps between cheap intervals. With max_cycles_per_day=1, isolated
cheap intervals were merged into one continuous segment by filling every gap
in between, without ever trimming the surplus back down, resulting in
achieved_soc_percent far above 100%.
Add a post-bridging trim step that removes segment-edge intervals (highest
price first) until total grid energy matches the requested target again,
while still respecting max_cycles_per_day/min_charge_duration_minutes and
never dropping below the target itself (fixed-power mode's expected
last-interval rounding overshoot is preserved).
A related edge case is also fixed: trimming could previously remove an
interval required to satisfy a must_reach_by deadline, silently flipping
deadline_met to False even though the overall energy target was still
reached. Deadline-critical intervals are now passed through as
protected_starts and are never removed during trimming.
Fixes#167
Impact: plan_charging no longer overcharges the battery/EV past the
requested target SoC when max_cycles_per_day or min_charge_duration_minutes
is set, and must_reach_by deadlines are honored even when those constraints
require bridging across expensive price gaps.
Accepts battery parameters (capacity, current/target SoC, max power) and
returns a cost-minimized charging schedule with per-interval power, SoC
progression, and total cost — no manual duration calculation needed.
Supports fixed, continuous (min_charge_power_w), and stepped
(charge_power_steps_w) charging modes, deadline-aware two-pass planning
(must_reach_soc + must_reach_by / must_reach_by_event), and round-trip
economics (expected_discharge_price, reserve_for_discharge,
max_cost_per_kwh) for arbitrage use cases. Includes min_charge_duration
and max_cycles_per_day constraints.
Groups deadline fields (must_reach_soc_*, must_reach_by,
must_reach_by_event) into a dedicated section so a deadline use case can
be configured in one place. Battery section lists capacity before the
percent SoC fields that depend on it. Response exposes stable reason
codes (already_at_target, energy_unreachable, energy_unreachable_by_
deadline, no_intervals_after_economic_filter, …) documented in the
service description and user docs.